678 Kitchens logo

678 Family · Kitchens

One kitchen.
One finish date.

Design-build kitchens for homes, restaurants, and food-service suites. Cabinets, stone, MEP, and tile run by one superintendent.

Browse the offers

Why we win

The date is the product.

Kitchen jobs die between the cabinet shop, the plumber, and the fabricator. 678 Kitchens sells a locked finish date and owns every trade that can blow it.

  • Design-build. Selections and rough-in are the same plan.

  • Restaurant hoods, grease, health-department path live in pre-con.

  • If the kitchen sits inside a renovation, it is not an orphan trade.

Who we sell

Homes and the businesses in the 678.

01

Home kitchens

Layout, cabinetry, stone, and lighting on one sequence.

02

Restaurants

Line, prep, dish, and front of house built to open.

03

Hair & nail salons

Break rooms and wet bars that hold up to a full book.

04

Grocery / cafe

Service counters, refrigeration circuits, and durable finishes.

05

Bookstores & specialty retail

Espresso and tasting counters with real plumbing behind them.

06

Warehouse office break rooms

Small footprint, hard use, quick turnover.

Offers

Three ways to start.

Kitchen Sprint

Tight scope, capped selections, week-count published up front.

Design-Build Gut

Full re-plan with a finish date in writing before demo.

Commercial Line

Hood, makeup air, interceptor, and inspections scoped in pre-con.

1

finish date at pre-con

0

vendors for the client to chase

7

trades sequenced

678

warranty after close

Questions

Straight answers.

You can. Then it is not a 678 finish-date job.

Lock the kitchen date.