Service · 04 · Kitchen & Bath

The room.
The date.

High-impact kitchen and bath rebuilds, coordinated with our kitchens division when the millwork demands it.

What you buy

Why this exists

Kitchens are the hardest small job in construction.

Every trade touches the room, the tolerances are visible from four feet away, and the household is living around it the whole time.

We treat it like a build, not a refresh: locked selections, wet walls engineered before demo, and a finish date you can plan takeout around.

6-10Weeks, demo to punch
1Selection list, locked pre-demo
0Cabinets ordered before final measure

What you buy

Scope, in plain language.

01

Galley-to-island conversions

Walls out, structure carried, one open room where three used to be.

02

Cabinetry and millwork

Semi-custom or shop-built, installed by finish carpenters and not by whoever is free.

03

Wet-wall relocation

New supply and drain runs, inspected, so the sink lands where you want it.

04

Counters and tile

Templated after cabinets, not before. Layout drawn before the first cut.

05

Primary baths and wet rooms

Waterproofing detailed and tested, curbless entries where the framing allows.

06

Lighting and power

Layered lighting, dedicated circuits and outlets where an appliance actually lives.

Who it's for

Built for these owners.

Not for cabinet-door refacing or countertop-only swaps.

  • Owners staying put and finally fixing the main room
  • Condo owners with building rules and freight elevators
  • Sellers doing one high-return renovation before listing
  • Anyone who has priced this twice and gotten two different scopes

What kills this job

Three ways it goes wrong.

Selections that arrive late

One backordered tile stops six trades. We lock and order before demo.

Cabinets ordered off the drawings

Field conditions never match paper. We final-measure after demo, every time.

Plumbing moved without a plan

Joist direction decides where drains can go. We verify before we promise an island sink.

How it runs

Discovery and measure, locked selection list, pre-order, then one continuous build with daily photos.

See the five phases

FAQ

Straight answers.

Do you supply selections?
We build your selection list in pre-construction and lock pricing before demo.
How long is a kitchen offline?
Typically six to ten weeks from demo to final punch.

Next step

Rebuild the room.
We answer the phone.