The room.
The date.
High-impact kitchen and bath rebuilds, coordinated with our kitchens division when the millwork demands it.
Why this exists
Kitchens are the hardest small job in construction.
Every trade touches the room, the tolerances are visible from four feet away, and the household is living around it the whole time.
We treat it like a build, not a refresh: locked selections, wet walls engineered before demo, and a finish date you can plan takeout around.
What you buy
Scope, in plain language.
Galley-to-island conversions
Walls out, structure carried, one open room where three used to be.
Cabinetry and millwork
Semi-custom or shop-built, installed by finish carpenters and not by whoever is free.
Wet-wall relocation
New supply and drain runs, inspected, so the sink lands where you want it.
Counters and tile
Templated after cabinets, not before. Layout drawn before the first cut.
Primary baths and wet rooms
Waterproofing detailed and tested, curbless entries where the framing allows.
Lighting and power
Layered lighting, dedicated circuits and outlets where an appliance actually lives.
Who it's for
Built for these owners.
Not for cabinet-door refacing or countertop-only swaps.
- Owners staying put and finally fixing the main room
- Condo owners with building rules and freight elevators
- Sellers doing one high-return renovation before listing
- Anyone who has priced this twice and gotten two different scopes
What kills this job
Three ways it goes wrong.
Selections that arrive late
One backordered tile stops six trades. We lock and order before demo.
Cabinets ordered off the drawings
Field conditions never match paper. We final-measure after demo, every time.
Plumbing moved without a plan
Joist direction decides where drains can go. We verify before we promise an island sink.
How it runs
Discovery and measure, locked selection list, pre-order, then one continuous build with daily photos.
FAQ
Straight answers.
- Do you supply selections?
- We build your selection list in pre-construction and lock pricing before demo.
- How long is a kitchen offline?
- Typically six to ten weeks from demo to final punch.