Service · 06 · Pre-Construction

Price it before
you demo it.

Budgeting, scheduling, constructability and permit strategy before a single wall comes down.

What you buy

Why this exists

The cheapest place to change your mind is on paper.

A wall moved in pre-construction costs an eraser. The same wall moved at framing costs a change order, and at drywall it costs two.

Pre-con buys you the real number, the real schedule and a permit path you can build from. Many clients start here and roll the fee into the build agreement.

Line-itemEstimate, not a range
WeeksSchedule you can plan around
Rolls inFee credited to the build

What you buy

Scope, in plain language.

01

Line-item budget

Priced by scope and quantity, with allowances called out where selections are open.

02

Constructability review

We read the drawings as builders and flag what will not build before it is bid.

03

Value engineering

Options that cut cost without cutting the things you will notice every day.

04

Permit strategy

Jurisdiction, review times and the sequence that gets you to a permit fastest.

05

Schedule

Trade-by-trade sequence with the long poles identified up front.

06

Procurement plan

Long-lead items identified and ordered before they can hold up the field.

Who it's for

Built for these owners.

Not a free estimate. Pre-con is scoped work with a deliverable you keep.

  • Owners deciding between renovating and moving
  • Anyone comparing two builders on wildly different numbers
  • Architects who need a builder's read before the client signs
  • Investors underwriting a project that has to pencil

What kills this job

Three ways it goes wrong.

Pricing off incomplete drawings

Missing details get priced as allowances, and allowances always break the budget.

Ignoring the long poles

Windows, steel and cabinets set the schedule. Everything else moves around them.

A permit path nobody researched

Different jurisdictions, different review times. We plan for yours specifically.

How it runs

Discovery walk, document review, estimate and schedule build, then a decision meeting where you own the deliverable.

See the five phases

FAQ

Straight answers.

Is pre-construction a separate contract?
It can be. Many clients start with pre-con, then roll it into the build agreement.
What do I get at the end?
A line-item estimate, a schedule and a permit path you can build from.